Land Clearing in Orlando, Florida
Forestry mulching, lot clearing and site preparation across Orlando and Orange County. One machine cuts, grinds and spreads in a single pass, so nothing is piled, burned or trucked off your street.
- Priced from photographs, usually same day
- Five jobs here since January 2025, latest June 2026
- From $3,000 a machine day
What we clear in Orlando
Eight things we are actually asked for on Orange County ground. If your job is not on this list, say so and we will tell you straight whether it is ours.
One machine cuts standing growth and grinds it back into the ground as chip in the same pass. No pile, no burn, no trucks.
A parcel that has sat while the city grew round it. Back to usable ground in a day or two and left as mulch.
Building envelope, drive and pad taken down to workable ground before your builder arrives. Steady work in a county building this fast.
Palmetto, pepper and vine taken out from under oaks and pines you are keeping.
You mark what stays and we cut round it. Live oaks are usually the thing worth protecting on a parcel here.
Where the roots have to come out rather than the top growth being ground off. Our 30 inch excavator mulcher.
Easements, retention edges and the line between you and next door, cleared without touching what the neighbour wants kept.
Mulching leaves everything where it falls. Grubbing does not, so the haul is quoted per job when it applies.
Who calls us in Orange County
A held parcel that needs to become a site, in a market where the holding cost of waiting is real. Mulching skips the clear, pile and haul stage entirely.
Ground behind the house that closed in years ago, opened back up without a burn permit or a skip on the drive.
Ground kept presentable and passable while the paperwork moves. A machine day is cheaper than a code case.
Clearing the envelope, the drive and the pad before the builder mobilises, so the site is ready rather than a delay.
A parcel nobody can see across is a parcel nobody buys. A day with a mulcher shows the buyer what they are actually looking at.
Site prep on a schedule, with a machine day you can put in a programme and a rate you can put in a bid.
How the work runs
Four steps, and the first two happen before anything leaves our yard.
Pictures with something in frame for scale, the parcel size, and a note on what you want left standing. On a city parcel a shot of the access matters as much as a shot of the growth.
Usually the same day. It is a day count against a published rate, not a guess dressed up as a quote. Orange County has run close to a day an acre for us on the bigger parcels.
The mulching head cuts, grinds and spreads as it goes. No separate clear, pile and haul stage, which is where most of the cost and all of the mess normally sits.
Not bare sand and not a field of cut stems. It holds the surface through the summer storms and slows down what comes back.
Our machines on Florida ground
Our own jobs, our own equipment. These are the machines that come to an Orange County parcel.




What it costs
We sell machine days, not acres, and we publish the rates. Every Orlando job we have run went out with the skid steer mulcher, which is the machine with transport included, so what you see quoted is what you pay.
Stems to 8 inches. Transport included. The machine that did all five of our Orlando jobs
Stems to 30 inches, and grubbing. Plus transport
Stems to 24 inches. Plus transport. The dearest machine we run
What moves the day count
The rate follows the machine rather than the size of the stem, which catches people out: the dedicated mulcher costs more than the excavator even though the excavator takes bigger timber and pulls roots. Transport is the cost of getting the bigger two machines to you and is separate from hauling material away, which is quoted per job.
What we have actually done in Orlando
Five finished jobs and seven machine days, from January 2025 to June 2026. All of it inside the last eighteen months, which makes this our fastest growing county.
| Jan 2025 | Six tenths of an acre, 1 machine day |
| Oct 2025 | A quarter acre, 1 machine day |
| Mar 2026 | Half an acre, 1 machine day |
| Apr 2026 and Jun 2026 | Two and a half acres each, 2 machine days each |
Three of the five finished inside a single machine day, and the two larger parcels took two days each. Every one of the five ran with the skid steer mulcher, which is unusual: most counties see a mix. Across Orange County, setting aside one job we do not publish details of, we have finished ten jobs and eleven and a half machine days.
The ground on an Orange County parcel
| What grows here | Live and laurel oak with cabbage palm on the better ground, slash pine over saw palmetto on the flatwoods, and Chinese tallow, camphor and Brazilian pepper filling anything that has been disturbed and left. Vine load is heavier here than on open country ground |
| What that means for a machine | Mixed rather than uniform. A parcel can be light scrub at one end and heavy vine and tallow at the other, which is why we want photographs of the worst part rather than the tidiest |
| Water | Flat sandy ground with retention ponds, swales and wetland edges threaded through the developed areas. Tracked machines cope, but the summer storm season moves the day count more than the acreage does |
| Access | City and suburban frontages, often with a gate, a kerb and neighbours either side. On the larger parcels out towards the county edge access stops being the constraint and acreage takes over |
Orlando jobs that went out with the skid steer mulcher, the machine with transport included in the rate. Most counties see a mix. This one has not.
What customers say
FloridaLandClearing.com was beyond helpful in getting our property cleared. They were spot on with their quote, their crews arrived on time, and the machines they used were impressive to watch.
Jenny AndersonWe had a difficult project a few other companies attempted and left. Florida Land Clearing was able to get the job done and a day earlier than quoted.
Joseph KellyThese guys are pros. Watching these machines just devour acres of underbrush in a day was one of the coolest things I have seen. I cannot believe how this transformed my property.
Adam WilsonBefore you book: trees on an Orange County parcel
The City of Orlando and Orange County each run their own tree rules, and which applies depends on whether your parcel is inside the city limits. Worth a look before you decide what comes down.
What is protected depends on the species and the size of the trunk, and whether the parcel is a single family homesite or land being developed. Larger specimen trees and live oaks are generally treated more carefully than understory growth or invasive species, and removing undergrowth is usually a different question from taking down a mature canopy tree.
Tell us what you want gone and what you want kept when you send photographs. We will tell you which trees look like the ones worth asking about before you spend anything.
We are a clearing contractor, not the permit office, and we do not file applications. Confirm your own parcel and your own trees with the City of Orlando or Orange County before you commit.
Orlando questions
How much does it cost to clear a lot in Orlando?
From $3,000 a machine day. Our smaller Orlando parcels, up to about half an acre, have all been single day jobs. The two and a half acre parcels took two days each. Send photographs and we will give you a day count rather than a range.
How long does it take?
Three of our five Orlando jobs were a single machine day. The two larger parcels took two days each. Heavy vine, tallow and trees you want kept are what push it, and we say so before you book rather than at the end of day one.
Which machine will you send?
On current form, the skid steer mulcher. All five Orlando jobs have gone out with it, which matters to your bill because that is the machine with transport included in the rate rather than added to it.
Can you work on a suburban lot without upsetting the neighbours?
That is the main reason people call for mulching rather than conventional clearing. Everything stays on site as chip, so there is no burn and no line of trucks down the street. One machine, one pass, gone the same day on most parcels.
What happens to everything you cut?
It stays on the ground as mulch, spread as the machine goes. Nothing piled, nothing burned. It holds the sand through the summer storms and slows down what comes back.
Do I need a permit?
It depends on the species and size of what is standing, and on whether you are inside the City of Orlando or in unincorporated Orange County. Confirm your parcel with the right office rather than taking a contractor word for it, ours included.
Are you licensed and insured?
Insured, and we send the certificate before the machine moves. Florida does not issue a contractor licence for forestry mulching, so nobody holds one. Insurance is the document worth asking every contractor to produce.
Get a price on your Orlando lot
Send a few photographs, the parcel size and a note on what you want left standing. Photograph the worst corner rather than the tidiest one, because that is the part that sets the day count.
Call or text 813-733-6607